Staff Cecil Lee Posted 1 hour ago Staff Share Posted 1 hour ago HDB Kim Keat Crest - Plus Estimated T.O.P. Date 1st December 2029 Kim Keat Crest - Plus (Feb 2026 Build-To-Order) Toa Payoh Bounded by Kim Keat Avenue and Toa Payoh East, Kim Keat Crest comprises 5 residential blocks, including 1 block dedicated to rental flats. The remaining 4 blocks, ranging from 26 to 30 storeys, will offer 1,151 units of 2-room Flexi, 3-room, and 4-room flats as Plus flats under the new flat classification framework. 1 of these blocks will also include 42 units of rental flats. Inspired by the crest of a wave, the project's name reflects its location near Kallang River and its riverine landscape design concept. This design will feature pathways that mimic the river's meandering flow, connecting residents to green spaces and landscaped courtyards. The building facades will echo this fluid theme with interlacing lines and textured panels that create a rhythmic visual pattern across the project. Kim Keat Crest will offer outdoor amenities for residents of all ages, such as children's playgrounds, fitness corners, and a hardcourt. A 3-storey preschool will also provide added convenience for young families. The Multi-Storey Car Park (MSCP) has a roof garden, providing an additional green space for relaxation. Commercial facilities including a minimart, an eating house, and shops will also be available to serve the daily needs of the community. Link to post Share on other sites More sharing options...
Staff Cecil Lee Posted 1 hour ago Author Staff Share Posted 1 hour ago The Remaining February 2026 HDB BTO Launch Sites Redhill Peaks https://www.geomancy.net/forums/topic/20824-hdb-redhill-peaks-prime-location-bto-feb-2026-build-to-order/ Sembawang Deck https://www.geomancy.net/forums/topic/20825-hdb-sembawang-deck-standard-bto-feb-2026-build-to-order/ Sembawang Voyage https://www.geomancy.net/forums/topic/20826-hdb-sembawang-voyage-standard-bto-feb-2026-build-to-order/ Tampines Bliss https://www.geomancy.net/forums/topic/20827-hdb-tampines-bliss-standard-bto-feb-2026-build-to-order/ Tampines Nova https://www.geomancy.net/forums/topic/20828-hdb-tampines-nova-plus-bto-feb-2026-build-to-order/ Link to post Share on other sites More sharing options...
Recommended Posts
Create an account or sign in to comment
You need to be a member in order to leave a comment
Create an account
Sign up for a new account in our community. It's easy!
Register a new accountSign in
Already have an account? Sign in here.
Sign In Now