Skip to content
View in the app

A better way to browse. Learn more.

FengShui.Geomancy.Net

A full-screen app on your home screen with push notifications, badges and more.

To install this app on iOS and iPadOS
  1. Tap the Share icon in Safari
  2. Scroll the menu and tap Add to Home Screen.
  3. Tap Add in the top-right corner.
To install this app on Android
  1. Tap the 3-dot menu (⋮) in the top-right corner of the browser.
  2. Tap Add to Home screen or Install app.
  3. Confirm by tapping Install.
About Feng Shui at Geomancy.Net
Sponsored Link
 

Cecil Lee

Staff
  • Joined

  • Last visited

Everything posted by Cecil Lee

  1. Costa Rhu T.O.P. in 1998 or under Period 7 Flying Star Feng Shui Highest at 17th storeys with a total of 737 units. Costa Rhu Condo Site plan
  2. T.O.P. in 2002. Under Period 7 Flying Star Feng Shui The Clearwater Site plan
  3. Chiltern Park Condo Site plan
  4. Changi Rise Condo Site plan
  5. Central Grove Condo Site plan T.O.P. in 2001 under Period 7 Flying Star Feng Shui
  6. Central Green Condo Site plan
  7. Cavendish Park Condo Site plan
  8. Cashew Hill by Far East Past review resource.
  9. Casablanca Site plan Past review resource
  10. The Caribbean Site plan Past review resource
  11. Blue Horizon Site plan from past reviews
  12. Bishan Park Site plan
  13. Baywater Site plan
  14. Bayshore Park Site plan
  15. 80cm is inauspicious. Thus other than the standard measurement of 60cm; Perhaps may consider either 67cm or 68cm instead. Height of altar opening is usually in multiples of 43cm. Thus can be 43 x 2 or 43 x 3 etc... Minimium depth of altar cabinet should instead be 40cm not 30cm.
  16. If you have the time, we have written this for you to have a better understanding .....
  17. I |I did a search in this forum. And there are as many as 531 postings or threads on this subject. And the messages goes back to 1999. There are more than adequate examples of anything related to altars. Thus other than anything out of the ordinary; please go thru the above to have a better understanding ....
  18. Part 3 - Obtain from your ERA agent a copy of the corridor plan and check to see where the central rubbish bin. 1. If the central rubbish bin happens to be beside the unit's main door or directly facing the unit's main door. Try to avoid purchasing such a unit:- 2. If you have the time, do go through the above resource before signing the dotted line. Good Luck! Huat Ah!
Sponsored Link
 
Background Picker

Account

Navigation

Search

Search

Configure browser push notifications

Chrome (Android)
  1. Tap the lock icon next to the address bar.
  2. Tap Permissions → Notifications.
  3. Adjust your preference.
Chrome (Desktop)
  1. Click the padlock icon in the address bar.
  2. Select Site settings.
  3. Find Notifications and adjust your preference.